We turn your 3D BIM model into fully construction-ready 2D documentation — accurate, standards-compliant, and formatted to your templates, so what’s issued matches exactly what was modelled.
Floor Plans (all levels) · Reflected Ceiling Plans · Elevations (4-way) · Building Sections · Wall Sections & Details · Door & Window Schedules · Room Finish Schedules · Site & Area Plans
Each sheet type is generated directly from model views, ensuring dimensional consistency and eliminating the discrepancies that arise when 2D drawings are produced separately from the 3D model.
AutoCAD DWG/DXF Export · Vector PDF (A1/A0) · ISO 128 Conventions · AIA/NCS Layer Standards · British Standard BS1192 · Client-Specific Title Blocks · LOD-Compliant Annotation · As-Built Documentation
We adapt to whichever standard your project or region requires, rather than forcing your documentation into a fixed template.
Model → View Setup → Sheet Creation → Export View templates are configured to match your drawing standards, sheets are populated and annotated directly from model geometry, and final exports are quality-checked before delivery in your required format.
File Format Options Available on Export
Deliverables in the Format You Need
List every export format you support so clients know their downstream tools are covered:
| Format | Typical Use |
| Review sets, permit submittals, field distribution | |
| DWG | Native AutoCAD editing/reference |
| RVT | Native Revit model handoff |
| DGN | MicroStation/DOT & infrastructure projects |
| IFC | Cross-platform BIM interoperability |
| NWD/NWC | Navisworks federated review |
| DWF/DWFx | Lightweight markup & review |
Revision control:
Every sheet carries a revision block (Rev #, date, description of change, initials) in the title block.
Revision clouds and delta triangles mark changed content on the sheet itself, tied to the revision number.
A master revision log tracks every issued revision across the full set, with issue purpose (e.g., “Issued for Coordination,” “Issued for Construction,” “Issued for Permit”).
Superseded sheets are archived, not deleted, maintaining full version history for the project record
Coordination Workflow with Structural & MEP Teams
How Sheets Move Through Coordination
Discipline models (structural, mechanical, electrical, plumbing) are received and federated into a single coordination model.
Automated clash detection flags conflicts between structural elements and MEP systems.
Recurring sessions (typically weekly) with structural and MEP leads to review flagged issues, assign resolution ownership, and confirm routing/clearance decisions.
Responsible discipline updates their model; changes are re-federated and re-checked.
Once a coordination milestone is signed off, sheets are generated/updated from the coordinated model, ensuring drawings reflect the current, clash-free state.
Structural and MEP leads formally acknowledge the coordinated sheet set before it moves to QC
This keeps drawings synchronized with the live coordination model rather than becoming outdated the moment a discipline makes a change
Quality-Check Process & Delivery SLA
Every Sheet Passes Through Structured QC Before Delivery
QC process (typical stages):
Delivery SLA (example — replace with your actual commitments):
Deliverable | Turnaround |
Standard sheet set (per discipline, per phase) | 5–7 business days |
Revision cycle (post-markup) | 2–3 business days |
Rush turnaround | 24–48 hours (premium rate) |
Final Issued-for-Construction set | Per project milestone schedule |
A working set of sample sheets across every discipline we coordinate. Click any sheet to open a full-size preview.
Key Deliverables
Revit Project Files (.rvt) · Navisworks NWD/NWC · IFC Export · Point Cloud Integration · BIM 360 / ACC Upload