We link your 3D model to the construction programme — visualising sequence, spotting conflicts early, and communicating build logic clearly to every stakeholder, from site teams to the client.
Construction sequence animation (Navisworks/Synchro) Gantt-to-model task linking Phasing plans by floor, zone, or package Logistics and crane-reach simulations Critical path visualisation overlaid on the model Weekly look-ahead 4D clips for site teams As-built vs. planned comparison, highlighting schedule variance visually
3D BIM is what the building looks like. 4D BIM is when it gets built.
A 4D model links the 3D building model to the construction programme (schedule), so you can watch the project go up on screen in the same order — and at the same pace — as it will on site.
Instead of reading a spreadsheet of task names and dates, everyone from the site team to the client can see what should be happening in week 12, spot problems before they happen (like two crews needing the same space on the same day), and agree on the plan visually — before a single trade shows up on site.
Software Used
Built on Industry-Standard Scheduling & Simulation Tools
Links the federated 3D model directly to the construction schedule to generate the 4D simulation, with clash-aware sequencing.
Purpose-built 4D construction sequencing software, used for more advanced scenario comparison (e.g., comparing planned vs. as-built sequencing, resourcing, and site logistics).
Combines programme management with 4D visualization, popular where Asta is already the scheduling tool of choice.
Note briefly that the choice of tool is typically driven by whichever scheduling software (P6, MS Project, Asta) the client or main contractor already uses, to keep the link between programme and model as direct as possible.
Key Benefits
Why Contractors and Clients Use 4D Simulation
Keep each benefit to one strong sentence on the page itself; the detail above is useful as supporting/expandable copy or hover tooltips
A 3D model shows what's being built. 4D links that model to the construction schedule — so you can watch the building rise in sequence, before ground is broken. Drag the slider to see it in action.
Spot out-of-sequence trades or blocked access routes on screen, months before they cause a delay on site.
Stakeholders watch the plan happen visually — no experience with programme software needed to follow along.
A shared visual plan speeds up stakeholder agreement and reduces disputes over what was actually agreed.